New MOT Facility
Location: Llanidloes, Wales
Job Category: Agriculture, Flooring
The project involved the preparation and foundational construction of a brand-new MOT (Ministry of Transport) vehicle testing facility. This included extensive groundworks and the installation of essential infrastructure prior to the erection of the main building.
Ground Reduction, Cut and Fill
Installation of a 30-Meter Maintenance Pit
Reinforced Concrete Floor Construction
Reinforcement was designed to structural specifications
A power-float finish ensured a smooth, durable surface with minimal dusting
The floor was cast in preparation for the new building to be erected
The project delivered a high-specification base ready for the steel structure and internal fit-out of the MOT centre. All works were completed to schedule, ensuring seamless progression to the next phase of construction for client Celtic Travel.