New MOT Facility

Location: Llanidloes, Wales

Job Category: Agriculture, Flooring

The project involved the preparation and foundational construction of a brand-new MOT (Ministry of Transport) vehicle testing facility. This included extensive groundworks and the installation of essential infrastructure prior to the erection of the main building.

  • Ground Reduction, Cut and Fill

  • Installation of a 30-Meter Maintenance Pit

  • Reinforced Concrete Floor Construction

  • Reinforcement was designed to structural specifications

  • A power-float finish ensured a smooth, durable surface with minimal dusting

  • The floor was cast in preparation for the new building to be erected

The project delivered a high-specification base ready for the steel structure and internal fit-out of the MOT centre. All works were completed to schedule, ensuring seamless progression to the next phase of construction for client Celtic Travel.

Next
Next

Calf Rearing Shed